A lot of scenery progress has happened in 2019, with the photos below a testament to the activity that has happened in the shed.
A few notable aspects that have occurred this year:
1) Signal are installed and powered by switches.
2) All Tortoises are installed (except two that I am still thinking about) and controlled from fascia panels.
3) Fascia is installed right around and painted black.
4) Nathan's Point and Heidiville have ground throws installed and wired up for frog power plus track is fully ballasted with a lot of dirt and grass now installed as well.
5) Ballasting in recent months has consisted of 4kg of Matt's Ballast Dunmore HO.
6) Expansion joints have been cut after a rather warm start to summer and track buckles in some locations.
7) All track is now painted flat camo brown ready for ballasting
8) A lot of industries have some form of building and activity to make it look ready for business.
9) Clean up has commenced and more stuff to go onto Ebay!
Enjoy to photos!