Having worked the track aruund Jonestown Junction last weekend, I made a strong start on Jonestown mainline, to the terminus station, plus started the planning for the main yard.
The main and loop tracks are laid, and wiring will happen over the next few days, and then onto the yard.
The yard ladder is difficult as I am trying to get good length sidings, but basically run out of room at the far end of the photo, where the trains all converge and run to a head shunt which needs to be about 1m long.
I'll get the main and loop operational, plus install the Tortoises and do the control panel, and then start planning out the yard arrangement.
Enjoy!
Sunday, September 2, 2018
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment